Projects



The Personal laboral Projects are:

Proposal for the Normative Design of Pumped Hydroelectric Plants for COHERSA - Honduras
2023/05 - 2023/06
Freelance Professional - Kiev Associates
- Project Management: the proposal for the regulatory design of pumped hydroelectric plants for COHERSA in Honduras was managed. The project was led by PM Fredy Saravia Poicon. - Data and business analysis: an analysis of the Honduran, Chilean and Peruvian regulatory, normative and legislative framework was carried out for the preparation of a regulatory proposal adapted to the local context.



Dispatches for Risk Assessment for Stoppage CPM - ELECTROPERU
2022/12 - 2023/03
Freelance Professional - Kiev Associates
Project Management: the office was managed for the evaluation of risks due to the stoppage of CPM for ELECTROPERU. The project was led by PM Fredy Saravia Poicon. - Data and business analysis: data was extracted and managed from the free databases of OSINERGMIN and COES - SINAC (Fita 2022, Transmission Plan 2021-2030, MODPLAN) to carry out data and business analysis. - Feasibility, operation and contingency studies: a Perseus modeling of base scenarios (optimistic, realistic and conservative) and output of 2 hydroelectric power plants was carried out for generation projections (thermal and RER).



Development of La Vegona Generation Project
2022/11 - 2022/12
Freelance Professional - Kiev Associates
Project Management: The development of the La Vegona generation project was managed and was led by PM Fredy Saravia Poicon. - Data and business analysis: The extraction and management of databases of the Honduran electrical power system was carried out to obtain perspectives on electrical generation and SSCC studies. - Feasibility, operation and contingency studies: A modeling of current Honduran national regulations and alternatives developed at the Latin American level was carried out, both for generation costs and SSCC regulation.



Feasibility study for mining project in demand area 10
2022/07 - 2022/07
Independent Professional - Consultant Dheybi Cervan Prado
- Data and business analysis: The management of electrical databases of the adjacent concession area was carried out to obtain medium and long-term investment perspectives, as well as the evaluation of suppliers. - Feasibility, operation and contingency studies: A feasibility study was carried out for the project in question.



Development of electrical evaluation models for pre-operational studies
2022/03 - 2022/10
Freelance Professional - Kiev Associates
Project Management: The project was led by PM Fredy Saravia Poicon and Eng. Eduardo Zolezzi Chacon. - Data and business analysis: The extraction and management of databases of the electrical power system was carried out to obtain perspectives in long-term electrical studies with Open Access models. - Feasibility, operation and contingency studies: Power flows were carried out for the validation of pre-operation studies.



Analysis of the operation and supply quality.
2014/10 - 2016/04
Operations and service quality analyst - EDELNOR
Project Management: Worked in coordination with Scrum & Prince2 under the direction of MBA Jorge Juscamayta Meza and Eng. Fernando Fernandez Valeriano. - Data and business analysis: The analysis of the company's meter database was carried out at the transmission level and free customers in the concession area, as well as the preparation of executive reports and KPIs on the state of the company in national comparison. In addition, reports were reported with regulatory agents and perspectives on predictive maintenance and risks in transmission equipment were carried out. The company's technical losses were also calculated and insights were developed to reduce them. - Feasibility, operation and contingency studies: ION meter programming and monitoring, operability and contingency studies, alarm programming for circulating current in substation transformers, preparation of load projections for predictive maintenance monitoring, maintenance and calibration of ION meters in transmission substation installations and maintenance of the meter integration framework.



Preparation of plans for HVAC projects.
2014/01 - 2014/09
HVAC Designer - Designer Daniel Obara Avi